Bid Name: | Waste Water Treatment Plant Arc Flash Assessment |
Bid Status: | Awarded |
Bid Awarded Date: | Thu Dec 1, 2022 (MST) |
Published Date: | Mon Jul 18, 2022 4:00:59 PM (MDT) |
Bid Closing Date: | Tue Aug 16, 2022 2:00:59 PM (MDT) |
Question Deadline: | Tue Aug 9, 2022 12:00:00 PM (MDT) |
Time-frame for delivery or the duration of the contract: | Refer to project document |
Negotiation Type: | Refer to project document |
Condition for Participation: | Refer to project document |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
The Regional Municipality of Wood Buffalo (RMWB) requires an electrical engineering firm to review, study, and analyze RMWB Wastewater Facilities for the potential of Arc Flash and/or electrical shock. |
Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
Trade Agreement Description: |
Show Trade Agreement Description [+]
NWPTA
|
Categories: |
Show Categories [+]
|
Awarded Summary
CIMA is the highest scored proponent, but their consulting engineering firm does not have the resources to open all energized equipment in pump stations to gather required data for the arc flash study as required for this project. They advised that if RMWB is not able to provide their electricians to open the energized equipment, they would like not to pursue this opportunity any further.
Enerxion is the 2nd highest scored proponent and they have an experienced electrician to open and close all energized equipment in pump stations to gather required data for the arc flash study as required for this project.